Site Plan Approval (Town Planner)
Permitted use subject to issuance of a building and/or zoning permit and subject to § 177-42B 
Site plan, lot split or lot line revision approval.
 
(1) The Town Planner shall review applications requiring site plan approval and applications for lot split approval or lot line revision and shall approve, disapprove or approve with modification such proposed site plan, lot split or lot line revision within 65 days after having received all of the information described in § 177-41B for the application. The petitioner or applicant may consent to one or more extensions of the sixty-five-day period specified in this subsection, provided the total extension period shall not be for longer than 65 days. Any proposed site plan, lot split or lot line revision not acted upon within said sixty-five-day period, as said period may have been extended, shall be considered approved, provided that it conforms to all specific requirements of this chapter, and the Town Planner shall issue a certificate to that effect at the applicant's request.

(2) In acting on a proposed site plan, lot split or lot line revision, the Town Planner shall determine that the requirements of this chapter are met in fact. In so doing, the Planner shall consult with the Director of Community Development on all matters regarding engineering and with any other Town official the Planner may deem necessary.

(3) After the approval, the applicant shall submit to the Town Planner three black-and-white prints and one transparent print on permanent material of the approved site plan, lot split or lot line revision. The Town Planner shall file one print of the approved site plan, lot split or lot line revision, with the approval noted thereon. One print of said site plan shall be made available to the applicant.

All other permit applications.
 
(1) Upon determination of the Town Planner that the proposed structure or use complies with this chapter, the Town Planner shall issue the required zoning permit. One copy of the approved plot plan shall be returned to the applicant with the approval and number of the permit noted thereon. A copy of the permit shall be displayed at the premises at all times until a certificate of occupancy has been issued. A copy of the approved plans shall be available for inspection at the premises during regular working hours.

(2) Before the actual placement of the foundation of any structure, the contractor or owner shall stake out the location of the proposed foundation and supply the Building Inspector with a certificate by a licensed surveyor that the location of such foundation, or any part of a structure to be erected thereon, complies with the approved plot plan. Failure to supply said certificate shall automatically suspend the permit under which the work has been authorized, until said certificate has been supplied to the Building Inspector.

See § 177-42: Application approval procedure for detailed information on the application procedure.